{"id":5036,"date":"2026-04-27T09:31:40","date_gmt":"2026-04-27T09:31:40","guid":{"rendered":"https:\/\/beereno.es\/the-7-phases-of-a-renovation-and-what-you-should-be-clear-about-in-each-one\/"},"modified":"2026-04-27T11:09:24","modified_gmt":"2026-04-27T11:09:24","slug":"the-7-phases-of-a-renovation-and-what-you-should-be-clear-about-in-each-one","status":"publish","type":"post","link":"https:\/\/beereno.es\/en\/the-7-phases-of-a-renovation-and-what-you-should-be-clear-about-in-each-one\/","title":{"rendered":"The 7 phases of a renovation (and what you should be clear about in each one)"},"content":{"rendered":"\n<p>Renovating a house isn&#8217;t just about construction. It&#8217;s about making the right decisions at the right time. And that&#8217;s where most projects get complicated. Not because they&#8217;re poorly executed, but because they start without clarity, progress without a structure, and important decisions are made too late.    <\/p>\n\n<p>Therefore, understanding <strong>the phases of a renovation<\/strong> is key to avoiding mistakes, delays, and cost overruns.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>What are the phases of a reform?<\/strong><\/h3>\n\n<p>Reforms that work always follow a clear process: <strong>Definition \u2192 Budget \u2192 Planning \u2192 Preparation \u2192 Execution \u2192 Monitoring \u2192 Delivery<\/strong><\/p>\n\n<p>Each phase has a goal. And skipping steps is usually costly. <\/p>\n\n<p><strong>1. Definition: what exactly are you going to reform?<\/strong><\/p>\n\n<p>The foundation of the entire project. Here you must specify: <\/p>\n\n<ul class=\"wp-block-list\">\n<li>what do you want to renovate<\/li>\n\n\n\n<li>what does the project include<\/li>\n\n\n\n<li>what it doesn&#8217;t<\/li>\n\n\n\n<li>what is a priority<\/li>\n<\/ul>\n\n<p><strong>Common mistake:<\/strong> requesting quotes without clearly defining the scope of work. <strong>Result:<\/strong> prices that can&#8217;t be compared and unclear decisions. <strong>Tip:<\/strong> the clearer you are here, the fewer problems you&#8217;ll have later.<\/p>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1409042417-1024x683.jpg\" alt=\"\" class=\"wp-image-5019\" style=\"aspect-ratio:1.4993030985311462;width:420px;height:auto\" srcset=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1409042417-1024x683.jpg 1024w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1409042417-300x200.jpg 300w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1409042417-768x512.jpg 768w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1409042417-1536x1024.jpg 1536w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1409042417-2048x1365.jpg 2048w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1409042417-900x600.jpg 900w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p><strong>2. Budget: how much does it really cost<\/strong><\/p>\n\n<p>The budget is not just a number. It must answer: <\/p>\n\n<ul class=\"wp-block-list\">\n<li>what does it include exactly<\/li>\n\n\n\n<li>what it doesn&#8217;t include<\/li>\n\n\n\n<li>what margin is there for unforeseen events?<\/li>\n<\/ul>\n\n<p><strong>Common mistake:<\/strong> choosing the cheapest quote without understanding it. <strong>Result:<\/strong> cost overruns during construction.<\/p>\n\n<p><strong>Tip:<\/strong> Look for clarity, not just price.<\/p>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-944129986-1024x683.jpg\" alt=\"\" class=\"wp-image-5021\" style=\"width:428px;height:auto\" srcset=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-944129986-1024x683.jpg 1024w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-944129986-300x200.jpg 300w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-944129986-768x512.jpg 768w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-944129986-1536x1024.jpg 1536w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-944129986-2048x1365.jpg 2048w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-944129986-900x600.jpg 900w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p><strong>3. Planning: realistic (not ideal) timeframes<\/strong><\/p>\n\n<p>Here&#8217;s how the project is organized over time:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>estimated duration<\/li>\n\n\n\n<li>order of work<\/li>\n\n\n\n<li>possible overlaps<\/li>\n<\/ul>\n\n<p><strong>Common mistake:<\/strong> accepting optimistic deadlines. <strong>Result:<\/strong> delays and frustration.<\/p>\n\n<p><strong>Tip:<\/strong> Plan ahead.<\/p>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1886\" height=\"1257\" src=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1164941473-edited.jpg\" alt=\"\" class=\"wp-image-5025\" style=\"width:438px;height:auto\" srcset=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1164941473-edited.jpg 1886w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1164941473-edited-300x200.jpg 300w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1164941473-edited-1024x682.jpg 1024w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1164941473-edited-768x512.jpg 768w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1164941473-edited-1536x1024.jpg 1536w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1164941473-edited-900x600.jpg 900w\" sizes=\"auto, (max-width: 1886px) 100vw, 1886px\" \/><\/figure>\n\n<p><strong>4. Preparation: everything ready before starting<\/strong><\/p>\n\n<p>One of the most underrated phases. It includes: <\/p>\n\n<ul class=\"wp-block-list\">\n<li>purchase of materials<\/li>\n\n\n\n<li>organization of space<\/li>\n\n\n\n<li>necessary permits<\/li>\n<\/ul>\n\n<p><strong>Common mistake:<\/strong> starting without having everything prepared. <strong>Result:<\/strong> constant delays.<\/p>\n\n<p><strong>Tip:<\/strong> Good preparation speeds up everything else.<\/p>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1390674679-1024x683.jpg\" alt=\"\" class=\"wp-image-5027\" style=\"width:441px;height:auto\" srcset=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1390674679-1024x683.jpg 1024w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1390674679-300x200.jpg 300w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1390674679-768x512.jpg 768w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1390674679-1536x1024.jpg 1536w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1390674679-2048x1366.jpg 2048w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1390674679-900x600.jpg 900w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p><strong>5. Execution: putting the plan into reality<\/strong><\/p>\n\n<p>This is the most visible phase. Here, what has already been defined is put into action. <\/p>\n\n<p><strong>Common mistake:<\/strong> making important decisions during construction. <strong>Result:<\/strong> changes, delays, and cost overruns.<\/p>\n\n<p><strong>Tip:<\/strong> The more decided you are beforehand, the better the execution will flow.<\/p>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1763521200-1024x683.jpg\" alt=\"\" class=\"wp-image-5029\" style=\"width:444px;height:auto\" srcset=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1763521200-1024x683.jpg 1024w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1763521200-300x200.jpg 300w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1763521200-768x512.jpg 768w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1763521200-1536x1024.jpg 1536w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1763521200-2048x1365.jpg 2048w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1763521200-900x600.jpg 900w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p><strong>6. Monitoring: continuous control of the project<\/strong><\/p>\n\n<p>Maintaining order is key.<\/p>\n\n<ul class=\"wp-block-list\">\n<li>validate progress<\/li>\n\n\n\n<li>manage changes<\/li>\n\n\n\n<li>maintain clear communication<\/li>\n<\/ul>\n\n<p><strong>Common mistake:<\/strong> not documenting decisions. <strong>Result:<\/strong> misunderstandings.<\/p>\n\n<p><strong>Tip:<\/strong> Everything important should be clear and recorded.<\/p>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"636\" src=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/Marcelo-ahorro-mas-de-1.600-E-con-BeeReno-21-1024x636.png\" alt=\"\" class=\"wp-image-5031\" style=\"width:450px;height:auto\" srcset=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/Marcelo-ahorro-mas-de-1.600-E-con-BeeReno-21-1024x636.png 1024w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/Marcelo-ahorro-mas-de-1.600-E-con-BeeReno-21-300x186.png 300w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/Marcelo-ahorro-mas-de-1.600-E-con-BeeReno-21-768x477.png 768w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/Marcelo-ahorro-mas-de-1.600-E-con-BeeReno-21.png 1450w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p><strong>7. Delivery: close smoothly<\/strong><\/p>\n\n<p>It&#8217;s not just about finishing. It&#8217;s about validating that everything is correct: <\/p>\n\n<ul class=\"wp-block-list\">\n<li>final review<\/li>\n\n\n\n<li>settings<\/li>\n\n\n\n<li>project closure<\/li>\n<\/ul>\n\n<p><strong>Common mistake:<\/strong> reaching this stage with unresolved issues. <strong>Result: <\/strong> final conflicts.<\/p>\n\n<p><strong>Tip:<\/strong> A good delivery depends on all of the above.<\/p>\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1289722335-1024x683.jpg\" alt=\"\" class=\"wp-image-5033\" style=\"aspect-ratio:1.4992720695283892;width:453px;height:auto\" srcset=\"https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1289722335-1024x683.jpg 1024w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1289722335-300x200.jpg 300w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1289722335-768x512.jpg 768w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1289722335-1536x1024.jpg 1536w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1289722335-2048x1365.jpg 2048w, https:\/\/beereno.es\/wp-content\/uploads\/2026\/04\/iStock-1289722335-900x600.jpg 900w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h3 class=\"wp-block-heading\"><strong>Most common mistakes in a renovation<\/strong><\/h3>\n\n<p>These are the most common mistakes:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>to start without properly defining the project<\/li>\n\n\n\n<li>not aligning expectations with the professional<\/li>\n\n\n\n<li>accept unrealistic timeframes<\/li>\n\n\n\n<li>making decisions during the work<\/li>\n\n\n\n<li>not following up on the project<\/li>\n<\/ul>\n\n<h3 class=\"wp-block-heading\"><strong>How to avoid problems during a renovation<\/strong><\/h3>\n\n<p>The key is in the process:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>define well before starting<\/li>\n\n\n\n<li>communicate clearly<\/li>\n\n\n\n<li>respect each phase<\/li>\n\n\n\n<li>document decisions<\/li>\n<\/ul>\n\n<p><em>Find out more on our <a href=\"https:\/\/www.instagram.com\/beerenoservices\/?hl=es\" title=\"\">Instagram<\/a>!<\/em><\/p>\n\n<h3 class=\"wp-block-heading\"><strong>How BeeReno helps you at every stage<\/strong><\/h3>\n\n<p>Managing a renovation can be complex. But having the right tools makes all the difference.  With BeeReno you can:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Talk to professionals from the beginning and define the project well.<\/li>\n\n\n\n<li>Align expectations before budgeting<\/li>\n\n\n\n<li>Centralize all communication in one place<\/li>\n\n\n\n<li>Track without losing key information<\/li>\n<\/ul>\n\n<p>Because when everything is clear from the beginning, the reform flows better.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Conclusion: a renovation doesn&#8217;t begin at the construction site<\/strong><\/h3>\n\n<p>Start well in advance. Understanding and adhering to the phases is what prevents problems, delays, and unnecessary costs. <strong>Begin your renovation with everything clear from the start. <a href=\"https:\/\/app.beereno.com\/auth\/start\" title=\"\">Do it with BeeReno.<\/a><\/strong> <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Renovating a house isn&#8217;t just about construction. It&#8217;s about making the right decisions at the right time. And that&#8217;s where most projects get complicated. Not because they&#8217;re poorly executed, but&#8230;<\/p>\n","protected":false},"author":1,"featured_media":5020,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[29],"tags":[],"class_list":{"0":"post-5036","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-highlights"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/posts\/5036","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/comments?post=5036"}],"version-history":[{"count":1,"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/posts\/5036\/revisions"}],"predecessor-version":[{"id":5037,"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/posts\/5036\/revisions\/5037"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/media\/5020"}],"wp:attachment":[{"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/media?parent=5036"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/categories?post=5036"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/beereno.es\/en\/wp-json\/wp\/v2\/tags?post=5036"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}